8.1 Instrument Procurement
The
specifications required for the applications for which the data will be used
(see Sections
5.0 and 6.0) along with the test method to be used to determine conformance
with the specification should be a part of the procurement document. A good
QA Plan will require a QA sign-off of the procurement document for an
instrument system containing critical requirements. An instrument should not
be selected solely on the basis of price and a vague description, without
detailed documentation of sensor performance
8. QUALITY ASSURANCE AND QUALITY CONTROL
8.1 Instrument Procurement
8.1.1 Wind Speed
8.1.2 Wind Direction
8.1.3 Temperature and Temperature Difference
8.1.4 Dew Point Temperature
8.1.5 Precipitation
8.1.6 Pressure
8.1.7 Radiation
8.2 Installation and Acceptance Testing
8.2.1 Wind Speed
8.2.2 Wind Direction
8.2.3 Temperature and Temperature Difference
8.2.4 Dew Point Temperature
8.2.5 Precipitation
8.2.6 Pressure
8.2.7 Radiation
8.3 Routine Calibrations
8.3.1 Sensor Check
8.3.2 Signal Conditioner and Recorder Check
8.3.3 Calibration Data Logs
8.3.4 Calibration Report
8.3.5 Calibration Schedule/Frequency
8.3.6 Data Correction Based on Calibration Results
8.4 Audits
8.4.1 Audit Schedule and Frequency
8.4.2 Audit Procedure
8.4.3 Corrective Action and Reporting
8.5 Routine and Preventive Maintenance
8.5.1 Standard Operating Procedures
8.5.2 Preventive Maintenance
8.6 Data Validation and Reporting
8.6.1 Preparatory Steps
8.6.2 Levels of Validation
8.6.3 Validation Procedures
8.6.4 Schedule and Reporting
8.7 Recommendations