8.2 Installation and Acceptance Testing
The
installation period is the optimal time to receive appropriate training in
instrument principles, operations, maintenance, and troubleshooting, as well
as data interpretation and validation. Meteorological consultants as well as
some manufacturers and vendors of meteorological instruments provide these
services.
An
acceptance test is used to determine if an instrument performs according to
the manufacturer's specifications [2]. Manufacturer's procedures for
unpacking, inspection, installation, and system diagnostics should be
followed to assure that all components are functioning appropriately. All
acceptance-testing activities should be documented in the station log.
8. QUALITY ASSURANCE AND QUALITY CONTROL
8.1 Instrument Procurement
8.1.1 Wind Speed
8.1.2 Wind Direction
8.1.3 Temperature and Temperature Difference
8.1.4 Dew Point Temperature
8.1.5 Precipitation
8.1.6 Pressure
8.1.7 Radiation
8.2 Installation and Acceptance Testing
8.2.1 Wind Speed
8.2.2 Wind Direction
8.2.3 Temperature and Temperature Difference
8.2.4 Dew Point Temperature
8.2.5 Precipitation
8.2.6 Pressure
8.2.7 Radiation
8.3 Routine Calibrations
8.3.1 Sensor Check
8.3.2 Signal Conditioner and Recorder Check
8.3.3 Calibration Data Logs
8.3.4 Calibration Report
8.3.5 Calibration Schedule/Frequency
8.3.6 Data Correction Based on Calibration Results
8.4 Audits
8.4.1 Audit Schedule and Frequency
8.4.2 Audit Procedure
8.4.3 Corrective Action and Reporting
8.5 Routine and Preventive Maintenance
8.5.1 Standard Operating Procedures
8.5.2 Preventive Maintenance
8.6 Data Validation and Reporting
8.6.1 Preparatory Steps
8.6.2 Levels of Validation
8.6.3 Validation Procedures
8.6.4 Schedule and Reporting
8.7 Recommendations