8.4.1 Audit
Schedule and Frequency
An
initial audit should be performed within 30 days of the start-up date for
the monitoring program. The 30-day period is a compromise between the need
for early detection and correction of deficiencies and the time needed for
shake-down and training. Follow-up audits should be conducted at six-month
intervals.
8. QUALITY ASSURANCE AND QUALITY CONTROL
8.1 Instrument Procurement
8.1.1 Wind Speed
8.1.2 Wind Direction
8.1.3 Temperature and Temperature Difference
8.1.4 Dew Point Temperature
8.1.5 Precipitation
8.1.6 Pressure
8.1.7 Radiation
8.2 Installation and Acceptance Testing
8.2.1 Wind Speed
8.2.2 Wind Direction
8.2.3 Temperature and Temperature Difference
8.2.4 Dew Point Temperature
8.2.5 Precipitation
8.2.6 Pressure
8.2.7 Radiation
8.3 Routine Calibrations
8.3.1 Sensor Check
8.3.2 Signal Conditioner and Recorder Check
8.3.3 Calibration Data Logs
8.3.4 Calibration Report
8.3.5 Calibration Schedule/Frequency
8.3.6 Data Correction Based on Calibration Results
8.4 Audits
8.4.1 Audit Schedule and Frequency
8.4.2 Audit Procedure
8.4.3 Corrective Action and Reporting
8.5 Routine and Preventive Maintenance
8.5.1 Standard Operating Procedures
8.5.2 Preventive Maintenance
8.6 Data Validation and Reporting
8.6.1 Preparatory Steps
8.6.2 Levels of Validation
8.6.3 Validation Procedures
8.6.4 Schedule and Reporting
8.7 Recommendations